Guangzhou Metro

Guangzhou Metro opened in 1999. The network covers much of the city center and is one fo main transportation vehicles in ¡ª Guangzhou. The fare ranges from RMB 2 to 12. Most of the signs and announcements are also in English. Tickets are bought from vending machines in the stations. Bills from RMB 5 ¡ª10 or coins from RMB 0.5 ¡ª 1 are accepted at ticket vending machines. Smaller bills can change at the customer service counter. The ticket is a small plastic token, which use at the gate entering the platform, and at the exit.

Getting to Canton Fair

  • Line 1

    If you take Line 1 first, please get off at Gongyuanqian Station and transfer to Line 2 (To Guangzhou South Railway Station). Then get off at Changgang Station and transfer to Line 8, get off at Xingangdong Station (to Area A,C) or get off at Pazhou Station (to Area B,C)

  • Line 2

    If you take Line 2 first, please get off at Changgang Station and transfer to Line 8, get off at Xingang Station (to Area A, C) or get off at Pazhou Station (to Area B, C)

  • Line 3

    If you take Line 3 first, please get off at Kecun Station and transfer to Line 8 (To Wanshengwei). Then get off at Xingangdong Station (to Area A,C) or get off at Pazhou Station (to Area B,C)

  • Line 4

    If you take Line 4 first, please get off at Wanshengwei Station and transfer to Line 8. Then get off at Xingangdong Station (to Area A,C) or get off at Pazhou Station (to Area B,C)

  • Line 5

    There are two ways to get to Canton Fair, if you take Line 5 first.
    Firstly, please get off at Zhujiang New Town Station and transfer to Line 3 (To Panyu Square). Then get off at Kecun Station and transfer to Line 8 (To Wanshengwei), get off at Xingangdong Station (to Area A,C) or get off at Pazhou Station (to Area B,C)
    Secondly, you can get off at Chebeinan Station and transfer to Line 4 (To Jinzhou Station), get off at Wanshengwei Station and transfer to Line 8. Then get off at Xingangdong Station (to Area A,C) or get off at Pazhou Station (to Area B,C)

  • Line 8

    If you are close to Line 8, please get off at Xingang Station (to Area A, C) or get off at Pazhou Station (to Area B, C)

Route map

Guangzhou Metro

Four Metro lines of 54.12 kilometers have been completed and opened in Guangzhou, with an average passenger capacity of 585,000 person-times per day. Lines under construction include Lines 3, 4, 5, 6, the extensions of Lines 2 and 8, and Guangzhou -Foshan Section of Pearl-River-Delta Inter-city Track Transport.

Getting to GuangZhou

Getting to Canton Fair

TIPS

Map of guangzhou